SOW BLOCK CRACK

Industry Type

Product Group

Our solution

Product
LOTHERME 352

Size (mm)
4

QTY (Kgs)
28

Product
LOTHERME 470M

Size (mm)
4

QTY (Kgs)
108

JOB PICTURES

Before

Before

After

After

ANALYSIS

PRODUCT DETAIL
SOW BLOCK

PROBLEM
BROKEN

NATURE OF PROBLEM
DIE SEATING/ HOLDING DISTURBED

PROBLEM DUE TO
MATERIAL FATIQUE

PREVIOUS SOLUTION
NA

BASE METAL
DIN 2714

NO. OF JOBS
1

Procedure

Re-dry of electrode : Oven has been used during welding

Preheat temperature: Job was preheated to 300̊ C

Inter- Pass temperature: Other than welding area, Job has been completely covered with Heating Coil & glass wool and maintained 300 ̊ C during welding.

Post heat treatment: SRC has been done at 660 ̊ C Soaking Two Hours. Slow Cooling.

USED LOTHERME 355 FOR COMPLETE CLADDING AND ROOT THEN LOTHERME 470 M FOR BUILD UP.

Further Reading on Case Studies

WELDING REBUILDING OF RING ROLLING CO-AXIAL ROLL

Read Case Study
Contact Us

Choose any option to contact us